Atlantic White-Cedar cones

On-line Proceedings of the
2009 Atlantic White-Cedar Symposium

The Ecology and Management of
Atlantic White-Cedar (Chamaecyparis thyoides) Ecosystems

A Symposium held on June 9, 10, and 11, 2009 at the
City Hotel and Bistro in Greenville, North Carolina - USA


Table of Contents and Conference LInks

Planning for Large Scale Atlantic White-Cedar Restoration, The Eel River Case Study

Marty Melchior and Keith Underwood, Inter-Fluve, Inc.

Presented by Marty Melchior

The Eel River restoration project (Plymouth, MA) represents one of the largest Atlantic white-cedar (AWC) restoration projects attempted. The project, set to begin construction in June 2009, involves the conversion of 40 acres of cranberry bog to cedar swamp, dam removal and the construction of over a mile of stream. This presentation will review the planning and decision making process that led to AWC restoration inclusion, and will detail the methods used for propagation, growth and the timely delivery of healthy trees.

Proceedings Table of Contents and Conference Links